Headcorn Tennis Club
At A Glance
- Outdoor Courts: The project included three full-size outdoor tennis courts, upgraded to meet modern lighting standards for enhanced playability.
- Mid-Winter Install: The entire installation was completed in just 2-3 days during mid-winter, minimising disruption to club activities and operations.
- LED Fittings: The upgrade utilised both 600W and 400W LED fittings, providing balanced lighting for center and perimeter courts.
- LTA LUX Levels: New lighting was installed to meet LTA- recommended lux levels, ensuring optimal visibility and performance during play.
- Full Fixture Swap: The project involved a complete swap from outdated sodium lights to energy- efficient LED fittings, improving quality and efficiency.
- On-Site LUX Verified: Lux levels were verified on-site after installation, confirming compliance with LTA standards and ensuring superior lighting performance.
Upgrading Headcorn's Tennis Experience
The Club faced poor lighting conditions that affected play. PPG delivered a swift LED upgrade to enhance visibility, ensuring members enjoy a brighter, more enjoyable tennis experience throughout the season.
Our Game Plan
STRIP-OUT & DISPOSAL
Removed all existing sodium fixtures and control gear, ensuring responsible disposal without leaving any remnants behind at the site.
LUX TESTING
Conducted on-site lux testing to verify compliance with LTA-recommended levels, logging all results for the club’s operational records.
NEW LED FITTINGS
Installed 600W and 400W LED floodlights, precisely matched to the column layout for consistent light coverage across all courts.
JANUARY TURNAROUND
Completed the entire upgrade within 2–3 days, ensuring minimal disruption to club play and full electrical certification upon sign-off.
Challenges Faced
- Weather Conditions: January’s unpredictable weather posed challenges with cold, wet surfaces and limited daylight, requiring precise scheduling and quick execution.
- Precision Aiming: Achieving LTA lux uniformity across three courts required meticulous aiming adjustments, ensuring every degree of tilt delivered optimal lighting performance.
- Column Wiring: Outdated internal wiring was not compatible with new fixtures, necessitating careful replacement without compromising the structural integrity of the columns.
- Clean Handover: Proper disposal of old fixtures and thorough certification processes ensured a tidy site, with all compliance documentation provided to the club.